Existing plant in main boiler house was not efficient and causing maintenance issues.
Design and build project to upgrade.
Existing pipework had a pressure test carried out and was passed as fit for purpose, reducing costs.
Boilers were replaced with 2 nos. Ideal Evomax 100kw condensing boilers.
The pipework was adapted to fit a new expansion vessel and pressurisation […]
Putney High School For Girls
Air Conditioning, Electrical, Maintenence, Mechanical Engineering
Wentworth School
Air Conditioning, Electrical, Maintenence, Mechanical Engineering
To remove existing oil filled boilers and oil tank. Replace with fully condensing gas fired boiler system with designed and manufactured flue.
Upgrade controls to BMS Trend system complete with head end.
Install new heating distribution pipework throughout the school with new LST radiators.
Lag and isogenapak all pipework.
Upgrade existing gas supply line to the school.
Flush, clean and […]
Basildon & Thurrock University Hospital
Air Conditioning, Electrical, Maintenence, Mechanical Engineering
To assist with high legionella readings at Hospital.
Various control measures implemented and temperatures recorded before and after works.
Removing dead legs from pipework
Lagging exposed pipework to increase temperatures
Replacing flexible hoses with hard tails
Balancing systems to maintain flow of water
Adapting pipework to maintain secondary returns
Installation of new isolation and balancing valves
Cleaning and chlorination of water systems
Maintaining and […]