This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

Mechanical Engineering

Prudential Building – Holborn Bars – London

,

Site:
Prudential Building, Holborn Bars, London
Project Schedule
To replace existing heating and condensate pumps in main boiler room.
Installation of new plate heat exchangers, primary and secondary pumps.
Installation of new BMS panels.
Maintaining existing building services whilst works in progress.

Project Value
Circa £1M

Putney High School For Girls

, , ,

Existing plant in main boiler house was not efficient and causing maintenance issues.
Design and build project to upgrade.
Existing pipework had a pressure test carried out and was passed as fit for purpose, reducing costs.
Boilers were replaced with 2 nos. Ideal Evomax 100kw condensing boilers.
The pipework was adapted to fit a new expansion vessel and pressurisation […]

Wentworth School

, , ,

To remove existing oil filled boilers and oil tank. Replace with fully condensing gas fired boiler system with designed and manufactured flue.
Upgrade controls to BMS Trend system complete with head end.
Install new heating distribution pipework throughout the school with new LST radiators.
Lag and isogenapak all pipework.
Upgrade existing gas supply line to the school.
Flush, clean and […]

Basildon & Thurrock University Hospital

, , ,

To assist with high legionella readings at Hospital.
Various control measures implemented and temperatures recorded before and after works.
Removing dead legs from pipework
Lagging exposed pipework to increase temperatures
Replacing flexible hoses with hard tails
Balancing systems to maintain flow of water
Adapting pipework to maintain secondary returns
Installation of new isolation and balancing valves
Cleaning and chlorination of water systems
Maintaining and […]